Back to the listing
- Quihub Ready Built Factory in Quy Nhon Dong ward, Gia Lai province
Gallery
Rent
rent
Quihub Ready Built Factory in Quy Nhon Dong ward, Gia Lai province
$6,320
165.57 triệu
Ref.No. RBF-GL-p005
R7M9+9F5, Nhơn Hội, Quy Nhon, Binh Dinh, Vietnam, Vietnam
Size: 4000 sq m
Features
National Grid System
CAR PARKING
MAIN STREET
SECURITY
High Ceilings
Office Space
EPE Applicable
Quihub ready-built factory project is located in Nhon Hoi A Industrial Zone (IZ), serving as a dedicated infrastructure solution to support startups and SMEs within the park.
Designed as a launchpad for emerging businesses, the complex offers flexible layouts, a variety of unit sizes, and integrated support services. It provides convenient, ready-to-use production and workspace facilities that help enterprises reduce setup time and initial investment costs. By enabling quick project deployment and efficient business operations, the project allows startups and SMEs to focus on their core strengths and accelerate growth.
Total area: 49,816m2
Prime Location
Located in the Nhon Hoi A Industrial Zone, a prime location with convenient transportation connections to the airport, seaport, and major economic centers
Optimal design: suitable for various types of production
The service factories are designed with flexible sizes to meet various needs and are easily customizable, ensuring safety and efficiency for production and business activities
- Size: 2 types of sizes from 3,840m2; 5.600m2
- Floor Loading capacity: 1 tons/m2
- Standard Amenities: offices, wastewater collection, clean water pumping station, fire protection system, parking lot…
Investment incentives for Nhon Hoi Economic Zone:
- Tax rate of 10% for 15 years
- Exemption for 4 years, and 50% reduction of payable tax for the next 9 years
(In case of having no payable tax income within 3 years since the first turnover-generated year, the tax exemption or reduction duration shall be automatically calculated from the fourth year)
- Tax exemption for imported goods to create fixed assets of the project
- Exemption of tax for 5 years from the production date for materials and components that can not be produced domestically.
Accessibility
- Road: National Road 1A, 1D, 19, 19B
- Railway: Dieu Tri Railway Station (15km - 25 minutes)
- Seaport: Quy Nhon Port (8km - 15 minutes)
- Airway: Phu Cat Airport (30km - 40 minutes)
- City center: Quy Nhon City (6km - 10 minutes)
Infrastructure
- Electricity: Transformer with total capacity of 2x63 MVA
- Water Supply: Phase 1: 24,000 m3/day; Phase 2: 100,000 m3/day
- Wastewater Treatment: In operation
- Internet: Provided by wide range of services
Add this listing to your favorites
Thanks to this you will be able to return to the observed ads by clicking the heart icon in the upper right corner

